[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987580":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987580,722,2,"多选题","确认质量改进效果时，应注意（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","使用同一种图表比较改进前后特性值",true,{"key":16,"text":17,"correct":18},"B","换用其他图表比较，验算改进前后效果",false,{"key":20,"text":21,"correct":14},"C","如果改进未达预期效果，应检查是否严格按计划实施",{"key":23,"text":24,"correct":14},"D","如果按计划实施未达预期效果，应回到掌握现状阶段",{"key":26,"text":27,"correct":14},"E","将改进成果换算成金额会让管理者认识到改进的重要性","ACDE","确认质量改进效果时，注意事项有：①应确认在何种程度上做到了防止质量问题再发生，用于改进前后比较的图表最好前后一致；②对于企业经营者来说，将质量改进的成果换算成金额是重要的；③采取对策后没有出现预期结果时，应确认是否严格按照计划实施的对策，如果是，就意味着对策失败，重新回到“掌握现状”阶段。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]