[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987458":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},987458,722,1,"单选题","在批生产阶段早期环境应力筛选应（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","100%进行",true,{"key":16,"text":17,"correct":18},"B","抽样进行",false,{"key":20,"text":21,"correct":18},"C","视产品质量情况具体决定试验样本量",{"key":23,"text":24,"correct":18},"D","条件不具备可部分进行","不论是产品开发阶段，还是批生产阶段早期，环境应力筛选在元器件、组件、部件等产品层次上都应100%的进行。在批生产阶段后期，对组件级以上的产品可根据其质量稳定情况抽样进行。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]