[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987217":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},987217,722,1,"单选题","过程能力指数不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","双侧公差情况的过程能力指数",false,{"key":16,"text":17,"correct":14},"B","单侧公差情况的过程能力指数",{"key":19,"text":20,"correct":21},"C","无偏移情况的过程能力指数",true,{"key":23,"text":24,"correct":14},"D","有偏移情况的过程能力指数","过程能力指数存在三种情况：①双侧公差情况的过程能力指数；②单侧公差情况的过程能力指数；③有偏移情况的过程能力指数。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]