[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987198":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},987198,722,2,"多选题","A公司长期以来一直是某总装厂的主要配件供货单位，最近该总装厂向供应商提出了提供过程监控证据的要求，A公司为了满足顾客要求，准备在全公司开始推行统计过程控制。 试对下列题目进行分析。 对控制图进行分析时，正确的做法是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","首先分析极差图",true,{"key":16,"text":17,"correct":14},"B","点子出界时判异",{"key":19,"text":20,"correct":14},"C","连续15个点子在界内的C区时即判异",{"key":22,"text":23,"correct":24},"D","无出界点，判断过程处于统计控制状态",false,"ABC","无出界点，但是如果界内点排列不随机，则过程也是未处于统计控制状态的。",{"id":6,"name":28,"category":29,"favorite":30},"中级质量专业理论与实务","建筑工程",0]