[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987174":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987174,722,2,"多选题","在绘制 -R图的程序中，确定控制对象时，需要注意（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","若指标之间有因果关系，则宁可取作为因的指标为统计量",true,{"key":16,"text":17,"correct":14},"B","控制对象要明确，并为大家理解与同意",{"key":19,"text":20,"correct":14},"C","控制对象要能以数字来表示",{"key":22,"text":23,"correct":14},"D","控制对象要选择容易测定并对过程容易采取措施者",{"key":25,"text":26,"correct":27},"E","选择生产上最重要的控制对象",false,"ABCD","绘制 -R图的程序中，确定控制对象时要注意六点：①选择技术上最重要的控制对象；②若指标之间有因果关系，则宁可取作为因的指标为统计量；③控制对象要明确，并为大家理解与同意；④控制对象要能以数字来表示；⑤控制对象要选择容易测定并对过程容易采取措施者。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]