[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987136":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},987136,722,1,"单选题","电话总机接转员每天的话务量不同，采用“平均差错数”评定工作质量，则适用的控制图为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","p图",false,{"key":16,"text":17,"correct":14},"B","np图",{"key":19,"text":20,"correct":21},"C","u图",true,{"key":23,"text":24,"correct":14},"D","c图","采用“平均差错数”评定工作质量，适用的控制图为u图；p控制图用于控制不合格率、废品率、交货延迟率、缺勤率、邮电、铁道部门的各种差错率等；c控制图用于控制一部机器，一个部件，一定的长度，一定的面积或任何一定的单位中所出现的缺陷数目；np控制图用于控制对象为不合格品数的场合。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]