[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987116":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987116,722,2,"多选题","分析用控制图主要分析内容有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","该过程的不合格品率",false,{"key":16,"text":17,"correct":18},"B","该过程的能力指数是否满足要求（也称技术稳态）",true,{"key":20,"text":21,"correct":18},"C","所分析的过程是否处于统计控制状态（也称统计稳态）",{"key":23,"text":24,"correct":14},"D","所分析的过程是否满足顾客要求",{"key":26,"text":27,"correct":14},"E","分析过程的合格品率","BC","分析用控制图主要分析两方面的内容：①所分析的过程是否处于统计控制状态；②该过程的过程能力指数是否满足要求。维尔达把过程能力指数满足要求的状态称作技术稳态。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]