[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987103":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},987103,722,1,"单选题","如果生产过程尚未充分稳定，此时（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","采用分析用控制图有助于将非稳态过程调整到稳态",true,{"key":16,"text":17,"correct":18},"B","不能使用控制图",false,{"key":20,"text":21,"correct":18},"C","采用控制用控制图有助于将非稳态过程调整到稳态",{"key":23,"text":24,"correct":18},"D","采用分析用控制图与控制用控制图都可以","一道工序开始应用控制图时，几乎总不会恰巧处于稳态，也即总存在异因。因此，总需要将非稳态的过程调整到稳态，这就是分析用控制图的阶段。等到过程调整到稳态后，才能延长控制图的控制线作为控制用控制图，这就是控制用控制图的阶段。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]