[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987095":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},987095,722,1,"单选题","在统计控制状态下，控制图上描点超出上、下控制限的概率约是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0. 27%",true,{"key":16,"text":17,"correct":18},"B","0. 135%",false,{"key":20,"text":21,"correct":18},"C","4. 5%",{"key":23,"text":24,"correct":18},"D","2. 3%","统计控制状态下，控制图上描点超出上、下控制限，这是犯了第一类错误，应按准则1处理。在3σ原则下，准则1犯第一类错误的概率为a = 0. 0027，即0. 27%。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]