[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987053":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987053,722,2,"多选题","统计过程控制的实施阶段包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","过程描述",false,{"key":16,"text":17,"correct":18},"B","过程识别",true,{"key":20,"text":21,"correct":18},"C","过程分析",{"key":23,"text":24,"correct":18},"D","过程控制",{"key":26,"text":27,"correct":14},"E","过程结果输出","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]