[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-986187":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},986187,720,2,"多选题","现场审核的准备包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","信息的收集和证实",false,{"key":16,"text":17,"correct":14},"B","确定审核组的权限",{"key":19,"text":20,"correct":21},"C","编制卑核计划",true,{"key":23,"text":24,"correct":21},"D","审核组工作分配",{"key":26,"text":27,"correct":21},"E","准备工作文件","CDE","现场审核的准备包括：①编制审核计划。审核组长应编制一份审核计划，为审核委托方、审核组和受审核方之间就审核的实施达成一致提供依据。②审核组工作分配。审核组长应与审核组协商，将具体的过程、职能、场所、区域或活动的审核职责分配给审核组每位成员。③准备工作文件。审核组成员应评审与其所承拊的审核工作有关的信息，并准备必要的工作文件，包括：检查表和审查抽样计划；记录信息的表格。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业相关知识","建筑工程",0]