[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-986186":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},986186,720,2,"多选题","在编制审核计划的过程中，受审核方的任何异议应在（ ）之间予以解决。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","审核小组",false,{"key":16,"text":17,"correct":18},"B","审核组长",true,{"key":20,"text":21,"correct":18},"C","审核委托方",{"key":23,"text":24,"correct":18},"D","受审核方",{"key":26,"text":27,"correct":14},"E","相应认证标准","BCD","审核组长应编制一份审核计划，为审核委托方、审核组和受审核方之间就审核的实施达成一致提供依据。审核计划应有一定的灵活性，应便于审核活动的日程安排和协调。受审核方的任何异议应在审核组长、受审核方和审核委托方之间予以解决。任何经修改的审核计划应在继续审核前征得有关各方的同意。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业相关知识","建筑工程",0]