[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-986087":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},986087,720,2,"多选题","关于卓越绩效评价准则的七类目，下列说法正确的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","领导决定和掌控着组织前进的方向",true,{"key":16,"text":17,"correct":14},"B","4.5节过程管理的主要活动内容是评价组织过程管理的主要方面",{"key":19,"text":20,"correct":21},"C","“领导”、“战略”、“顾客与市场”构成静态的“领导作用”三角",false,{"key":23,"text":24,"correct":21},"D","“资源”、“过程管理”、“经营结果”构成驱动性的“资源、管理和结果”三角",{"key":26,"text":27,"correct":14},"E","结果类H栏中与领导相对应的是组织的治理和社会责任结果","ABE","“领导”、“战略”、“顾客与市场”构成“领导作用”三角，是驱动性的；“资源”、 “过程管理”、“经营结果”构成“资源、过程和结果”三角，是从动性的；而“测量、分析和改进”犹如链接两个三角的“链条”，转动着改进和创新的PDCA之轮，不断提升组织的整体经营绩效和竞争能力。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业相关知识","建筑工程",0]