[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985879":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},985879,720,1,"单选题","下列（ ）不属于质量管理体系认证过程中认证申请与受理的主要活动内容。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","审核委托方向认证机构提出认证申请，申请书上应明确受审核方的名称和地址、业务范围以及审核目的等",false,{"key":16,"text":17,"correct":14},"B","认证机构应对申请书进行评审，以确认是否受理",{"key":19,"text":20,"correct":21},"C","对受审核方纠正措施的完成情况及其有效性进行验证",true,{"key":23,"text":24,"correct":14},"D","认证机构受理申请后应与审核委托方签订认证合同","认证申请与受理是质量管理体系认证的主要活动内容之一，其主要活动内容包括：①审核委托方向认证机构提出认证申请，申请书上应明确受审核方的名称和地址、业务范围以及审核目的等；②认证机构应对申请书进行评审，以确认是否受理；③认证机构受理申请后应与审核委托方签订认证合同。认证合同成明确双方的权利和义务以及受审核方的名称和地址、业务范围和审核目的等有关事项。C项属于纠正措施的验证的主要活动内容。",{"id":6,"name":27,"category":28,"favorite":29},"初级质量专业相关知识","建筑工程",0]