[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985851":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},985851,720,1,"单选题","关于现场审核，下列说法不正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","收集信息的方法包括：面谈、对活动的观察、文件评审",false,{"key":16,"text":17,"correct":14},"B","在现场审核前应准备必要的工作文件",{"key":19,"text":20,"correct":14},"C","在审核组分工应考虑审核员的能力、资源利用以及审核员、实习审核员和技术专家 的不同作用和职责等",{"key":22,"text":23,"correct":24},"D","当审核计划或审核范围需变更时，审核组长可自己进行更改并实施",true,"D项，审核的启动过程中，审核目的应由审核委托方确定，审核范围和准则应由审核委托方和审核组长确定。审核目的、范围和准则的任何变更都应征得原各方的同意。",{"id":6,"name":27,"category":28,"favorite":29},"初级质量专业相关知识","建筑工程",0]