[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985847":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},985847,720,1,"单选题","当审核不可行时，应在（ ）后向审核委托方提出替代建议。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","与受审核方协商",true,{"key":16,"text":17,"correct":18},"B","与审核委托方协商",false,{"key":20,"text":21,"correct":18},"C","审核小组讨论协商",{"key":23,"text":24,"correct":18},"D","参照相应审核准则","在确定审核目的、范围和准则之后，应进一步进行审核的可行性的确定。当审核不可行时，应在与受审核方协商后向审核委托方提出替代建议。",{"id":6,"name":27,"category":28,"favorite":29},"初级质量专业相关知识","建筑工程",0]