[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985845":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},985845,720,1,"单选题","下列各项中，（ ）不属于审核启动阶段的活动。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","指定审核组长",false,{"key":16,"text":17,"correct":14},"B","确定审核目的、范围和准则",{"key":19,"text":20,"correct":14},"C","选择审核组",{"key":22,"text":23,"correct":24},"D","文件评审",true,"审核启动阶段的活动主要包括：①指定审核组长；②确定审核目的、范围和准则；③确定审核的可行性；④选择审核组；⑤与受审核方建立初步联系。",{"id":6,"name":27,"category":28,"favorite":29},"初级质量专业相关知识","建筑工程",0]