[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985827":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},985827,720,1,"单选题","审核计划应由（ ）编制。[2008年真题]",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","审核委托方",false,{"key":16,"text":17,"correct":18},"B","审核组长",true,{"key":20,"text":21,"correct":14},"C","受审核方",{"key":23,"text":24,"correct":14},"D","认证机构","审核组长应编制一份审核计划，为审核委托方、审核组和受审核方之间就审核的实施达成一致提供依据。审核计划应有一定的灵活性，应便于审核活动的日程安排和协调。",{"id":6,"name":27,"category":28,"favorite":29},"初级质量专业相关知识","建筑工程",0]