[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985706":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},985706,720,1,"单选题","影响过程大小和子过程个数的因素不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","过程应用的目的",false,{"key":16,"text":17,"correct":14},"B","过程性质",{"key":19,"text":20,"correct":21},"C","过程的活动内容",true,{"key":23,"text":24,"correct":14},"D","识别过程的活动原则","过程可大可小，一个过程也可能包括多个分过程或子过程。这取决于过程应用的目的、过程的性质、识别过程的原则及希望达到的结果。",{"id":6,"name":27,"category":28,"favorite":29},"初级质量专业相关知识","建筑工程",0]