[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985634":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},985634,718,2,"多选题","利用控制图对过程进行监控，取样时应做到（ ）。[2008年真题]",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","子组内取样间隔越长越好",false,{"key":16,"text":17,"correct":18},"B","过程稳定性好时可以适当加大子组间取样间隔",true,{"key":20,"text":21,"correct":18},"C","同一子组应在相同的生产条件下取得",{"key":23,"text":24,"correct":18},"D","尽量缩短子组间取样间隔",{"key":26,"text":27,"correct":14},"E","过程劣化时可以适当加大子组间取样间隔","BCD","在许多控制图的计算过程中，在确定中心线及控制限时，需要抽取多个样本。在有关的控制图标准中，这样的样本称为子组，相应的样本量n称为子组大小。一般取 20~25个子组，子组大小一般取为4或5。利用控制图对过程进行监控，取样时为了使得所取数据属于同一总体，同一子组的数据应在同样的生产条件下取得，故要求在短间隔内来取。过程稳定性好时可以适当加大子组间取样间隔。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业基础理论与实务","建筑工程",0]