[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985549":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},985549,718,2,"多选题","统计过程控制能（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","应用统计技术对过程进行评估和监控",true,{"key":16,"text":17,"correct":14},"B","减少过程的波动",{"key":19,"text":20,"correct":14},"C","保持过程处于可接受的和稳定的质量水平",{"key":22,"text":23,"correct":24},"D","消除过程的波动",false,{"key":26,"text":27,"correct":24},"E","提高过程质量水平","ABC","统计过程控制（简称SPC）是应用统计技术对过程的各个阶段进行评估和监控，建立并保持过程处于可接受的并且稳定的水平，减少过程的波动，从而保证产品与服务符合规定的要求的一种质量管理技术。作为全面质量管理的一种重要技术，统计质量控制也强调全员参加与团队精神，而不是只依靠少数质量管理人员。统计质量控制强调整个过程，SPC控制的重点就在于“ P(Process) ”，即过程。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业基础理论与实务","建筑工程",0]