[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985518":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},985518,718,2,"多选题","QC小组活动的程序包括：组成小组、选题、（ ）和成果发表。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","组内例会",true,{"key":16,"text":17,"correct":18},"B","课题报告",false,{"key":20,"text":21,"correct":14},"C","小组及选题注册登记",{"key":23,"text":24,"correct":14},"D","课题完成",{"key":26,"text":27,"correct":18},"E","表彰","ACD","QC小组活动的程序包括：组成小组、选题、组内例会、小组及选题注册登记、课题完成和成果发表。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业基础理论与实务","建筑工程",0]