[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985504":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},985504,718,2,"多选题","分析原因用排列图与（ ）等过程因素有关，用来发现主要问题。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","操作者",true,{"key":16,"text":17,"correct":14},"B","机器",{"key":19,"text":20,"correct":14},"C","原材料",{"key":22,"text":23,"correct":14},"D","作业方法",{"key":25,"text":26,"correct":27},"E","质量",false,"ABCD","与分析原因用排列图有关的过程因素有：①操作者，包括班次、组别、年龄、经验、熟练情况以及个人本身因素；②机器，包括机器、设备、工具、模具和仪器；③原材料，包括制造商、工厂、批次和种类；④作业方法，包括作业环境、工序先后、作业安排和作业方法。E项是与分析现象用排列图有关的不良结果。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业基础理论与实务","建筑工程",0]