[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985428":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},985428,718,2,"多选题","质量改进成果报告应明确的内容有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","改进前的废品或其他，如时间、效率的损失总量",true,{"key":16,"text":17,"correct":14},"B","如果项目成功，预计可取得的成果",{"key":19,"text":20,"correct":14},"C","实际取得的成果及其他方面的收获",{"key":22,"text":23,"correct":14},"D","资本投入及利润",{"key":25,"text":26,"correct":27},"E","为质量改进团队配备的资源",false,"ABCD","通常质量改进成果报告应明确的内容有：①改进前的废品或其他如时间、效率的损失总量；②如果项目成功，预计可取得的成果；③实际取得的成果；④资本投入及利润；⑤其他方面的收获。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业基础理论与实务","建筑工程",0]