[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985408":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},985408,718,2,"多选题","质量改进的步骤中拟定并实施的对策有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","去除现象（结果）",true,{"key":16,"text":17,"correct":18},"B","确认效果",false,{"key":20,"text":21,"correct":18},"C","验证假说",{"key":23,"text":24,"correct":14},"D","消除引起结果的原因，防止再发生",{"key":26,"text":27,"correct":14},"E","隔断因果关系","ADE","质量改进的步骤中拟定实施对策有三种：①去除现象（应急对策）；②消除引起结果的原因，防止再发生（永久对策）；③隔断因果关系。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业基础理论与实务","建筑工程",0]