[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985406":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},985406,718,2,"多选题","在质量改进的“分析问题原因”阶段的活动内容为（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设立假说",true,{"key":16,"text":17,"correct":18},"B","计算质量问题损失金额",false,{"key":20,"text":21,"correct":18},"C","选定任务负责人",{"key":23,"text":24,"correct":14},"D","验证假说",{"key":26,"text":27,"correct":18},"E","对改进活动的费用做出预算","AD","在质量改进的“分析问题原因”阶段的活动内容为设立假说、验证假说。B项，计算质量问题损失金额是“掌握现状”的内容；C项，选定任务负责人是质量改进团队组织的内容；E项，对改进活动的费用做出预算是拟订对策的内容。",{"id":6,"name":31,"category":32,"favorite":33},"初级质量专业基础理论与实务","建筑工程",0]