[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985388":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},985388,718,1,"单选题","“拟定改进活动的时间表，初步制定改进计划”属于（ ）阶段的活动内容。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","选择课题",true,{"key":16,"text":17,"correct":18},"B","掌握现状",false,{"key":20,"text":21,"correct":18},"C","分析问题原因",{"key":23,"text":24,"correct":18},"D","拟定对策并实施","质量改进的选择课题阶段的活动内容有：①明确所要解决的问题为什么比其他问题重要；②问题的背景是什么，到目前为止的情况是怎样的；③将不尽如人意的结果用具体的语言表现出来，有什么损失，并具体说明希望改进到什么程度；④选定课题和目标值；⑤正式选定任务负责人；⑥如有必要，对改进活动的费用做出预算；⑦拟定改进活动的时间表，初步制定改进计划。",{"id":6,"name":27,"category":28,"favorite":29},"初级质量专业基础理论与实务","建筑工程",0]