[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-985362":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},985362,718,1,"单选题","在质量改进过程中，如果现状分析用的是排列图，确认效果时必须用（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","控制图",false,{"key":16,"text":17,"correct":14},"B","坐标图",{"key":19,"text":20,"correct":21},"C","排列图",true,{"key":23,"text":24,"correct":14},"D","直方图","用于改进前后比较的图表最好前后一致，如果现状分析用的是排列图，确认效果时也必须用排列图，这样会更加直观，具有可比性。",{"id":6,"name":27,"category":28,"favorite":29},"初级质量专业基础理论与实务","建筑工程",0]