[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984806":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},984806,715,2,"多选题","交易成本费用的发生可分为()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","为订立交易合同而发生的费用",true,{"key":16,"text":17,"correct":18},"B","总生产成本",false,{"key":20,"text":21,"correct":14},"C","为履行交易合同而发生的费用",{"key":23,"text":24,"correct":18},"D","销售成本",{"key":26,"text":27,"correct":18},"E","监督费用","AC","招标采购总成本由两部分内容构成：①招标采购合同价格；②招标采购合同价格之外的全部成本，又称交易成本。纵观招标采购的全过程，交易成本费用的发生可分为两个部分：①为订立交易合同而发生的费用；②为履行交易合同而发生的费用。招标人在采购中不仅要考虑招标采购合同的价格，还要考虑交易成本，使得招标采购总成本最低。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业知识与法律法规","建筑工程",1]