[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984802":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},984802,715,2,"多选题","对招标人而言，影响工程项目招标交易成本的主要因素有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","信息不对称",false,{"key":16,"text":17,"correct":18},"B","招标机制的选择",true,{"key":20,"text":21,"correct":14},"C","操纵招标行为",{"key":23,"text":24,"correct":18},"D","项目的规模",{"key":26,"text":27,"correct":18},"E","项目管理需求","BDE","对招标人而言，影响工程项目招标交易成本的主要因素主要有：①项目管理需求；②项目的规模；③项目的技术难度；④招标机制的选择。AC两项属于导致交易成加的具体原因。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业知识与法律法规","建筑工程",1]