[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984775":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},984775,715,2,"多选题","招标采购计划管理的具体内容包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","确定招标采购目标",true,{"key":16,"text":17,"correct":18},"B","招标采购目标的编制与实施",false,{"key":20,"text":21,"correct":14},"C","招标采购计划实施的过程控制与调整",{"key":23,"text":24,"correct":14},"D","招标采购计划完成情况的检查与评估",{"key":26,"text":27,"correct":14},"E","招标采购计划工作的总结与提高","ACDE","招标采购计划管理的具体内容包括：①确定招标采购目标；②招标采购计划的编制与组织实施；③招标采购计划实施的过程控制与调整；④招标采购计划完成情况的检查与评估；⑤招标采购计划工作的总结与提高。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业知识与法律法规","建筑工程",1]