[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984636":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},984636,715,1,"单选题","根据《建筑法》的规定，建设行政主管部门应当自收到申请之日起()日内，对符合条件的申请办理施工许可证。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","5",false,{"key":16,"text":17,"correct":14},"B","10",{"key":19,"text":20,"correct":21},"C","15",true,{"key":23,"text":24,"correct":14},"D","20","建筑工程施工许可，是指建筑行政主管部门依据法定程序和条件，对建筑工程是否具备施工条件进行审查，对符合条件者准许开始施工并颁发施工许可证的一种制度。建筑工程施工许可，采用的是颁发建筑工程施工许可证的方式进行管理。建设行政主管部门应当自收到申请之日起15日内，对符合条件的申请者颁发施工许可证。",{"id":6,"name":27,"category":28,"favorite":7},"招标采购专业知识与法律法规","建筑工程"]