[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984604":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},984604,715,1,"单选题","下列符合建设项目“三同时”的规定的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","公用工程必须与配套设施同时投产使用",false,{"key":16,"text":17,"correct":14},"B","防治污染的设施必须与配套设施同时开工",{"key":19,"text":20,"correct":14},"C","防治污染的设施必须与主体工程同时停工",{"key":22,"text":23,"correct":24},"D","防治污染的设施必须与主体工程同时投产使用",true,"建设项目“三同时”制度是指一切新建、改建和扩建的基本建设项目、技术改造项目、自然开发项目，以及可能对环境造成损害的工程建设项目，其所需要配套建设的防治污染和其他公害的环境保护设施，必须与主体工程同时设计、同时施工、同时投产使用。",{"id":6,"name":27,"category":28,"favorite":7},"招标采购专业知识与法律法规","建筑工程"]