[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984266":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},984266,715,1,"单选题","《公共示范法》规定的采购合同生效办法不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","发出接受通知书时生效",false,{"key":16,"text":17,"correct":14},"B","签署书面采购合同生效",{"key":19,"text":20,"correct":14},"C","主管机构批准时生效",{"key":22,"text":23,"correct":24},"D","签署合同确认书时生效",true,"《公共示范法》规定了采购合同生效方法，主要包括：①发出接受通知书时生效；②签署书面采购合同生效；③主管机构批准时生效。",{"id":6,"name":27,"category":28,"favorite":7},"招标采购专业知识与法律法规","建筑工程"]