[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984206":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},984206,715,1,"单选题","招标人在采购中不仅要考虑招标采购合同的价格，还要考虑()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","变动成本",false,{"key":16,"text":17,"correct":14},"B","风险成本",{"key":19,"text":20,"correct":14},"C","合同期限",{"key":22,"text":23,"correct":24},"D","交易成本",true,"招标采购总成本由两部分内容构成：①招标采购合同价格；②招标采购合同价格之外的全部成本，也称为交易成本。纵观招标采购的全过程，交易成本的发生可分两个部分：①为订立交易合同而发生的费用；②为履行交易合同而发生的费用。招标人在采购中不仅要考虑招标采购合同的价格，还要考虑交易成本，使得招标采购总成本最低。",{"id":6,"name":27,"category":28,"favorite":7},"招标采购专业知识与法律法规","建筑工程"]