[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984189":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},984189,715,1,"单选题","政府采购交易成本及控制的环节中，中期成本控制一实际采购成本控制不包括()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","代理成本控制",false,{"key":16,"text":17,"correct":14},"B","价格成本控制",{"key":19,"text":20,"correct":21},"C","控制资金利息成本",true,{"key":23,"text":24,"correct":14},"D","服务成本控制","政府采购交易成本及控制的环节中，中期成本控制一实际采购成本控制包括：①代理成本控制；②价格成本控制；③服务成本控制。其中，价格成本控制又包括鼓励低价中标、控制资金利息成本。",{"id":6,"name":27,"category":28,"favorite":7},"招标采购专业知识与法律法规","建筑工程"]