[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984183":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},984183,715,1,"单选题","政府采购交易成本及控制的环节不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","前期成本一筹备成本",true,{"key":16,"text":17,"correct":18},"B","缔约一招标操作成本控制",false,{"key":20,"text":21,"correct":18},"C","中期成本控制一实际采购成本控制",{"key":23,"text":24,"correct":18},"D","履约一验收及使用成本控制","采购成本的控制主要包括招标操作成本、实际采购成本、验收及使用成本三个关键环节，即缔约一招标操作成本控制、中期成本控制一实际采购成本控制、履约一验收及使用成本控制。",{"id":6,"name":27,"category":28,"favorite":7},"招标采购专业知识与法律法规","建筑工程"]