[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-714-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},714,"招标采购专业实务","建筑工程",0,3,50,865,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,285,296,308,320,332,344,354,364,376,388,400,412,424,436,445,456,468,477,489,501,509,521,533,545,554,563,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},983344,1,"单选题","机电产品国际招标项目中，若投标人对招标文件中的重要条款（参数）有任何一条偏离则()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","要求投标人重新修改",false,{"key":24,"text":25,"correct":22},"B","对技术一项的评分降低",{"key":27,"text":28,"correct":22},"C","继续评标",{"key":30,"text":31,"correct":32},"D","导致被否决投标",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},983345,"准备时间短，准备费用低的情况下，宜采用的合同类型为()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"总价合同",{"key":24,"text":41,"correct":22},"可调总价合同",{"key":27,"text":43,"correct":22},"单价合同",{"key":30,"text":45,"correct":32},"成本加酬金合同",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},983346,"工程建设项目设计的评审因素不包括()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"技术因素",{"key":24,"text":53,"correct":22},"商务因素",{"key":27,"text":55,"correct":32},"价格因素",{"key":30,"text":57,"correct":22},"经济因素",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},983347,"大型公共建筑工程概念性方案设计投标文件编制一般不少于40天，实施性方案设计投标文件编制一般不少于()天。",[62,64,66,68],{"key":20,"text":63,"correct":22},"25",{"key":24,"text":65,"correct":22},"35",{"key":27,"text":67,"correct":32},"45",{"key":30,"text":69,"correct":22},"55",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},983348,"根据《招标投标法实施条例》，关于工程建设项目招标标底的设置和作用，下列说法正确的是()。",[74,76,78,80],{"key":20,"text":75,"correct":32},"标底只能作为评标的参考",{"key":24,"text":77,"correct":22},"标底应当在招标文件中明确规定并事先公布",{"key":27,"text":79,"correct":22},"应当把投标报价是否接近标底作为中标条件",{"key":30,"text":81,"correct":22},"评标基准价的设置应当以标底上下浮动一定幅度为依据",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},983349,"关于履约担保，下列说法中不正确的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"履约担保具有担保中标人按照合同履约的目的",{"key":24,"text":89,"correct":32},"履约担保的法律效力等同于违约金",{"key":27,"text":91,"correct":22},"中标人不按要求提交履约担保的，投标保证金将不予退还",{"key":30,"text":93,"correct":22},"履约担保具有约束招标人按照合同履约的目的",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},983350,"编写机电产品国际招标文件，确定投标有效期的主要依据是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"招标人编制招标方案所需要的时间",{"key":24,"text":101,"correct":22},"投标人制作投标文件所需要的时间",{"key":27,"text":103,"correct":32},"招标人完成开标、评标、定标和签订合同等工作所需要的时间",{"key":30,"text":105,"correct":22},"中标人完成货物生产所需要的时间",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},983351,"下列评标方法中，属于《政府采购货物和服务招标投标管理办法》规定的评标方法的是()。",[110,112,114,116],{"key":20,"text":111,"correct":32},"最低评标价法",{"key":24,"text":113,"correct":22},"最低投标价法",{"key":27,"text":115,"correct":22},"价值工程法",{"key":30,"text":117,"correct":22},"技术必选法",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},983353,"在服务招标文件中，()是特许经营项目融资招标文件的核心内容。",[122,124,126,128],{"key":20,"text":123,"correct":22},"投标人须知",{"key":24,"text":125,"correct":32},"项目合同",{"key":27,"text":127,"correct":22},"投标文件格式",{"key":30,"text":129,"correct":22},"相关参考资料",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},983354,"依法必须招标的项目自招标文件开始发出之日起至投标人提交投标文件截止之日不得少于()日。",[134,136,138,140],{"key":20,"text":135,"correct":22},"3",{"key":24,"text":137,"correct":22},"5",{"key":27,"text":139,"correct":32},"20",{"key":30,"text":141,"correct":22},"30",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},983355,"投标有效期设置应合理，如果投标有效期过短，则造成的后果是()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"降低了招标人的风险",{"key":24,"text":149,"correct":22},"加大了投标人的风险",{"key":27,"text":151,"correct":32},"招标人在投标有效期内可能无法完成招标工作",{"key":30,"text":153,"correct":22},"投标人可能无法完成投标文件的编制工作",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},983356,"某生产企业拟采购一批工程车辆，为了充分体现绿色采购、低碳经济，以及政府对于车辆尾气排放和强制报废的要求，本次采购最适合的评标方法是()。",[158,160,162,164],{"key":20,"text":159,"correct":32},"全寿命周期成本计算法",{"key":24,"text":161,"correct":22},"栅栏评标法",{"key":27,"text":163,"correct":22},"性价比法",{"key":30,"text":165,"correct":22},"基于质量和成本的选择方法",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},983357,"招标人关于投标有效期的延长，应以()形式通知投标人。",[170,172,174,176],{"key":20,"text":171,"correct":32},"书面",{"key":24,"text":173,"correct":22},"口头",{"key":27,"text":175,"correct":22},"邮寄",{"key":30,"text":177,"correct":22},"双方约定的",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},983358,"工程招标文件中，“载明建设工程的分部分项工程项目、措施项目、其他项目的名称和相应数量，以及规费、税金项目等内容的明细清单”的内容属于()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"合同条款及格式",{"key":24,"text":185,"correct":32},"工程量清单",{"key":27,"text":187,"correct":22},"设计图纸",{"key":30,"text":189,"correct":22},"技术标准和要求",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},983359,"关于开标时间，下列说法中正确的是()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"政府采购项目开标时间推迟，应在开标前15日前通知",{"key":24,"text":197,"correct":22},"可以迟于提交投标文件截止时间",{"key":27,"text":199,"correct":22},"机电产品国际招标项目开标时间推迟，在开标3日前通知即可",{"key":30,"text":201,"correct":32},"投标截止时间推迟，则开标时间相应推迟",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},983360,"《标准设计施工总承包招标文件》规定，承包人建议书属于()的组成部分。",[206,208,210,212],{"key":20,"text":207,"correct":22},"资格预审文件",{"key":24,"text":209,"correct":22},"招标文件",{"key":27,"text":211,"correct":22},"投标文件",{"key":30,"text":213,"correct":32},"合同文件",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":30,"analysis":33},983361,"某公路隧道工程施工项目招标，计划工期320d，施工图样设计比较完善，工程分项清晰，但岩石类型的构成数量难以准确预测和计算，材料的市场价格平稳。该项目招标宜采用()合同。",[218,220,222,224],{"key":20,"text":219,"correct":22},"固定总价",{"key":24,"text":221,"correct":22},"固定单价",{"key":27,"text":223,"correct":22},"可调价格",{"key":30,"text":225,"correct":32},"成本加酬金",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},983362,"()是为了解决现场发生的零星工作的计价而设立的。",[230,232,234,236],{"key":20,"text":231,"correct":22},"暂列金额",{"key":24,"text":233,"correct":22},"暂估价",{"key":27,"text":235,"correct":32},"计日工",{"key":30,"text":237,"correct":22},"分部分项工程费",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},983363,"根据《招标投标法实施条例》，关于评标过程否决投标的说法，正确的是()。",[242,244,246,248],{"key":20,"text":243,"correct":22},"投标函未经投标单位盖章或单位负责人签字的，评标委员会应当否决其投标",{"key":24,"text":245,"correct":32},"投标联合体没有提交共同投标协议的，评标委员会应当否决其投标",{"key":27,"text":247,"correct":22},"招标文件是评标委员会否决投标的唯一依据",{"key":30,"text":249,"correct":22},"被否决的投标文件可以通过澄清予以补正",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},983364,"订立合同前，招标文件要求中标人提交履约保证金的，不得超过中标合同金额的()。",[254,256,258,260],{"key":20,"text":255,"correct":22},"7%",{"key":24,"text":257,"correct":22},"8%",{"key":27,"text":259,"correct":22},"9%",{"key":30,"text":261,"correct":32},"10%",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},983365,"如果开标时政府采购投标文件中开标一览表内容与投标文件中明细表内容不一致，在处理时应当以()为准。",[266,268,270,272],{"key":20,"text":267,"correct":32},"开标一览表",{"key":24,"text":269,"correct":22},"投标文件中明细表",{"key":27,"text":271,"correct":22},"投标文件中现有记录",{"key":30,"text":273,"correct":22},"招标最高评标价",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":30,"analysis":33},983366,"在工程施工合同按照合同计价方式和风险分担情况划分的类型中，()计价方式一般适用于核定合同价格时，工程内容、范围、数量不清楚或难以界定的工程建设项目。",[278,280,282,284],{"key":20,"text":279,"correct":22},"固定总价合同",{"key":24,"text":281,"correct":22},"固定单价合同",{"key":27,"text":283,"correct":22},"可调价格合同",{"key":30,"text":45,"correct":32},{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},983367,"下列各项属于评标方法的是()。",[289,290,292,294],{"key":20,"text":113,"correct":32},{"key":24,"text":291,"correct":22},"综合分析法",{"key":27,"text":293,"correct":22},"综合单价法",{"key":30,"text":295,"correct":22},"投票表决法",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},983368,"关于工程量清单的作用有不同的意见，如：①工程量清单是工程量清单计价的基础；②工程量清单是施工图设计的依据；③工程量清单是计算或调整工程量的依据；④工程量清单是编制招标控制价的依据；⑤工程量清单是编制竣工验收报告的依据。其中正确的是()。",[300,302,304,306],{"key":20,"text":301,"correct":32},"①③④",{"key":24,"text":303,"correct":22},"③④⑤",{"key":27,"text":305,"correct":22},"①②⑤",{"key":30,"text":307,"correct":22},"①④⑤",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},983369,"政府采购货物和服务招标项目及机电产品国际招标项目采用综合评估法评标时，规定必须采用()。",[312,314,316,318],{"key":20,"text":313,"correct":32},"低价优先方法",{"key":24,"text":315,"correct":22},"高价优先方法",{"key":27,"text":317,"correct":22},"综合评估法",{"key":30,"text":319,"correct":22},"公式法",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},983370,"下列各项对于联合体投标的理解，不正确的是()。",[324,326,328,330],{"key":20,"text":325,"correct":32},"投标联合体是招投标活动中一种特殊的招标人形式",{"key":24,"text":327,"correct":22},"常见于一些大型复杂的项目",{"key":27,"text":329,"correct":22},"投标人通常组成联合体形式参与投标，以增强投标竞争力",{"key":30,"text":331,"correct":22},"联合体应当在提交资格预审申请文件前组成",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":30,"analysis":33},983371,"关于投标文件的撤回与撤销，下列说法正确的是()。",[336,338,340,342],{"key":20,"text":337,"correct":22},"投标人撤销投标文件的，可以重新投标",{"key":24,"text":339,"correct":22},"投标人撤回投标文件的，招标人可以不退还投标人的投标保证金",{"key":27,"text":341,"correct":22},"投标人撤回投标文件的，应当以书面形式通知招标人和已参加投标的投标人",{"key":30,"text":343,"correct":32},"投标人撤回投标文件的，可以不再投标，也可在规定的投标截止时间前重新投标",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},983372,"适用于具有通用技术、性能标准，没有特殊性、单一性要求，但价格过低会影响合同履行或工程质量的招标项目的评标方法是()。",[348,350,352,353],{"key":20,"text":349,"correct":22},"经评审的最低投标价法",{"key":24,"text":351,"correct":32},"合理低价法",{"key":27,"text":161,"correct":22},{"key":30,"text":159,"correct":22},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},983373,"在工程施工监理招标文件中，()是中标人与招标人签订合同，明确双方权利、义务、责任的主要条件。",[358,359,360,362],{"key":20,"text":213,"correct":32},{"key":24,"text":123,"correct":22},{"key":27,"text":361,"correct":22},"监理大纲要求",{"key":30,"text":363,"correct":22},"工程技术文件",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":30,"analysis":33},983374,"下列各项不属于特许经营项目融资招标主要评标因素的是()。",[368,370,372,374],{"key":20,"text":369,"correct":22},"投标报价",{"key":24,"text":371,"correct":22},"技术和管理方案",{"key":27,"text":373,"correct":22},"项目合同响应方案",{"key":30,"text":375,"correct":32},"参考资料",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":30,"analysis":33},983375,"某工程建设项目在开标后，因为国家相关政策发生变化而暂停了一段时间，重新启动评标工作时，发现投标文件的有效期即将过期，无法完成评标工作。此时，招标人应当()。",[380,382,384,386],{"key":20,"text":381,"correct":22},"照常继续评标、签约等后续工作",{"key":24,"text":383,"correct":22},"宣布本次招标失败，重新组织招标",{"key":27,"text":385,"correct":22},"要求投标人延长投标有效期，不同意延长者，扣除投标保证金",{"key":30,"text":387,"correct":32},"要求投标人延长投标有效期，不同意延长者，退还投标保证金",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":27,"analysis":33},983376,"某机电产品国际招标项目的评标办法中规定：生产效率指标按照线性插值法计算得分，生产效率达到85%得3分，达到95%得8分。某投标文件中的生产效率为92%，则其生产效率指标得分为()分。",[392,394,396,398],{"key":20,"text":393,"correct":22},"3.5",{"key":24,"text":395,"correct":22},"5.5",{"key":27,"text":397,"correct":32},"6.5",{"key":30,"text":399,"correct":22},"7.5",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},983377,"下列关于栅栏评标法的说法正确的是()。",[404,406,408,410],{"key":20,"text":405,"correct":22},"栅栏评标法主要适用于技术、性能相对复杂，对投标人的财务状况和融资能力要求比较高的项目",{"key":24,"text":407,"correct":22},"栅栏评标法是特许经营项目融资招标评标方法最常用的评标方法",{"key":27,"text":409,"correct":32},"栅栏评标法第一阶段先对融资方案、技术和管理方案、项目协议响应方案进行评估",{"key":30,"text":411,"correct":22},"栅栏评价法第一阶段是对所有合格投标人的投标报价按投标价格高低排序",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},983378,"下列关于工程标底的说法，不正确的是()。",[416,418,420,422],{"key":20,"text":417,"correct":22},"标底是招标人能够接受的项目投资预测和市场预期价格",{"key":24,"text":419,"correct":22},"标底不能作为评定投标报价有效性和合理性的惟一和直接依据",{"key":27,"text":421,"correct":32},"招标文件中不得规定投标报价最接近标底的投标人为中标人，但可以规定超出标底价格上下允许浮动范围的投标报价作为废标处理",{"key":30,"text":423,"correct":22},"招标人自主决定是否编制标底，标底在编制过程中和开标前应当保密",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":30,"analysis":33},983379,"关于投标保证金的退还，下列说法正确的是()。",[428,430,432,434],{"key":20,"text":429,"correct":22},"工程建设项目招标人最迟应当在书面合同签订后7日内向中标人和未中标的投标人退还投标保证金及银行同期存款利息",{"key":24,"text":431,"correct":22},"机电产品国际招标项目，对未中标的投标人的投标保证金，招标人应当在发出中标通知书后5个工作日内退还",{"key":27,"text":433,"correct":22},"政府采购货物项目，招标采购单位应当在采购合同签订后7个工作日内退还未中标供应商的投标保证金",{"key":30,"text":435,"correct":32},"政府采购服务项目，中标供应商无正当理由拒绝签订合同的，不予退还其交纳的投标保证金",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},983380,"()的评分经常采用百分制。",[440,441,443,444],{"key":20,"text":163,"correct":32},{"key":24,"text":442,"correct":22},"综合评分法",{"key":27,"text":111,"correct":22},{"key":30,"text":161,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":24,"analysis":33},983381,"BOT项目招标方案中，投标人的()条款如果涉及修改招标文件的核心内容，则一般会被招标人拒绝。",[449,451,452,454],{"key":20,"text":450,"correct":22},"融资方案",{"key":24,"text":373,"correct":32},{"key":27,"text":453,"correct":22},"移交方案",{"key":30,"text":455,"correct":22},"建设方案",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},983382,"下列关于投标有效期的说法中，错误的是()。",[460,462,464,466],{"key":20,"text":461,"correct":22},"拒绝延长投标有效期的投标人有权收回投标保证金",{"key":24,"text":463,"correct":32},"投标有效期从投标人提交投标文件之日起计算",{"key":27,"text":465,"correct":22},"投标有效期内，投标文件对投标人有法律约束力",{"key":30,"text":467,"correct":22},"投标有效期的设定应保证招标人有足够的时间完成评标和与中标人签订合同",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},983383,"具有通用技术、性能标准或者招标人对其技术、性能没有特殊要求的工程建设项目的招标，一般适用的评标方法是()。",[472,473,474,476],{"key":20,"text":163,"correct":22},{"key":24,"text":349,"correct":32},{"key":27,"text":475,"correct":22},"综合评价法",{"key":30,"text":113,"correct":22},{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},983384,"潜在投标人在购买招标文件时就提交了投标保证金，但在投标文件提交截止时间前没有提交投标文件，投标人将承担的后果是()。",[481,483,485,487],{"key":20,"text":482,"correct":22},"投标保证金被没收",{"key":24,"text":484,"correct":22},"被记入违约黑名单",{"key":27,"text":486,"correct":32},"不承担法律责任",{"key":30,"text":488,"correct":22},"造成本次招标失败的，应当赔偿招标人损失",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},983385,"关于编制设计招标文件，下列说法不正确的是()。",[493,495,497,499],{"key":20,"text":494,"correct":32},"自发出招标文件至投标截止时间不少于30天",{"key":24,"text":496,"correct":22},"招标文件一般规定，当中、英文的意思表达不一致时，应以中文本为准",{"key":27,"text":498,"correct":22},"大型公共建筑工程概念性方案设计投标文件编制一般不少于40天",{"key":30,"text":500,"correct":22},"以中、英文两种文字编写时，两种文字具有同等效力",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},983386,"适用于工程规模较小、技术比较简单、工期较短，且核定合同价格时已经具备完整、详细的工程设计文件和必需的施工技术管理条件的工程建设项目的合同类型为()。",[505,506,507,508],{"key":20,"text":43,"correct":22},{"key":24,"text":39,"correct":32},{"key":27,"text":41,"correct":22},{"key":30,"text":45,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":30,"analysis":33},983387,"下列关于投标有效期的说法中，正确的是()。",[513,515,517,519],{"key":20,"text":514,"correct":22},"招标人延长投标有效期，应以书面形式通知投标人，该通知送达时投标有效期即获得延长",{"key":24,"text":516,"correct":22},"招标人延长投标有效期，应当相应延长投标截止时间",{"key":27,"text":518,"correct":22},"投标有效期内，投标文件对招标人和投标人均有合同约束力",{"key":30,"text":520,"correct":32},"投标有效期自投标人递交投标文件截止之日起计算",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":27,"analysis":33},983388,"下列标的招标中，最不适宜采用经评审的最低投标价法的是()。",[525,527,529,531],{"key":20,"text":526,"correct":22},"流感疫苗的试剂瓶",{"key":24,"text":528,"correct":22},"体育场的普通钢结构网架",{"key":27,"text":530,"correct":32},"新型电池材料的研制",{"key":30,"text":532,"correct":22},"货运船体的喷漆",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":30,"analysis":33},983389,"关于投标保证金的递交时间，下列说法正确的是()。",[537,539,541,543],{"key":20,"text":538,"correct":22},"银行电汇应在截止日期之前开始汇出",{"key":24,"text":540,"correct":22},"银行汇票应在投标截止日期之前开出",{"key":27,"text":542,"correct":22},"备用信用证的作用与银行保函不一样",{"key":30,"text":544,"correct":32},"支票应保证在投标截止日期之前划拨到招标人指定账户",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":30,"analysis":33},983390,"适用于工程和货物的采购，尤其适用于后期使用成本对采购决策起关键作用的工程和货物采购的评标方法是()。",[549,550,552,553],{"key":20,"text":349,"correct":22},{"key":24,"text":551,"correct":22},"综合评标法",{"key":27,"text":161,"correct":22},{"key":30,"text":159,"correct":32},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":30,"analysis":33},983391,"()是监理招标文件的组成部分，也是投标人编制监理投标文件、实施监理服务的依据之一。",[558,559,560,561],{"key":20,"text":123,"correct":22},{"key":24,"text":213,"correct":22},{"key":27,"text":361,"correct":22},{"key":30,"text":562,"correct":32},"基础资料",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},983392,"某依法必须招标的工程建设项目，计划开工日期十分紧迫，采用固定单价合同，其招标文件的桩基工程量清单数量为1000m 3 。招标人在投标截止前15d发出的招标文件澄清中修改了设计桩基直径，但没有修改桩基工程量清单数量。此时，投标人比较可行的做法是()。",[567,569,571,573],{"key":20,"text":568,"correct":22},"按照修改后的桩基直径自行计算工程量清单数量并据此报价",{"key":24,"text":570,"correct":22},"按照原桩基工程量清单数量1000m 3 投标报价",{"key":27,"text":572,"correct":32},"向招标人提出异议，根据答复澄清，确定投标报价的工程数量",{"key":30,"text":574,"correct":22},"按照设计修改后的桩基直径计算投标报价的工程数量，并书面通知招标人",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":30,"analysis":33},983393,"某工程建设项目采用由投标人确认的工程量清单报价，并实行固定总价合同。在合同履行过程中，发现招标文件中工程量清单的工程数量有漏项，该漏项工程量的费用()。",[579,581,583,585],{"key":20,"text":580,"correct":22},"由发包人承担，因为工程量清单出现的漏项属于发包人过错",{"key":24,"text":582,"correct":22},"由发包人和承包人各自承担一半",{"key":27,"text":584,"correct":22},"由发包人承担，因为该漏项并非承包人可以预见",{"key":30,"text":586,"correct":32},"由承包人承担",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":24,"analysis":33},983394,"()是项目招标投标活动的主要依据。",[591,593,594,595],{"key":20,"text":592,"correct":22},"招标公告",{"key":24,"text":209,"correct":32},{"key":27,"text":123,"correct":22},{"key":30,"text":211,"correct":22},[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]