[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-984091":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},984091,714,2,"多选题","关于公开招标和邀请招标方式的比较，下列说法正确的有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","公开招标适用于规模较大、建设周期较长的项目",true,{"key":16,"text":17,"correct":14},"B","邀请招标属于有限竞争性招标",{"key":19,"text":20,"correct":21},"C","邀请招标的社会资源耗费相对较大",false,{"key":23,"text":24,"correct":21},"D","邀请招标的招标成本较大",{"key":26,"text":27,"correct":14},"E","公开招标的招标工作量大","ABE","CD两项，就招标成本而言，邀请招标的招标时间、成本费用和社会资源消耗相对较少，公开招标的招标时间、成本费用和社会资源消耗相对较大。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业实务","建筑工程",0]