[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983940":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983940,714,2,"多选题","工程货物招标项目的初步评审中，响应性评审的评审因素包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","联合体投标",false,{"key":16,"text":17,"correct":18},"B","供货范围",true,{"key":20,"text":21,"correct":18},"C","技术参数",{"key":23,"text":24,"correct":18},"D","投标有效期",{"key":26,"text":27,"correct":18},"E","质量和标准","BCDE","工程货物招标项目的初步评审中，响应性评审的评审因素包括：①投标报价；②供货范围；③投标有效期；④投标保证金；⑤权利义务；⑥技术参数；⑦质量和标准；⑧服务承诺等。A项，联合体投标属于资格评审的评审因素。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业实务","建筑工程",0]