[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983930":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983930,714,2,"多选题","建设工程项目投标报价分析包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目特征和需求分析",false,{"key":16,"text":17,"correct":18},"B","工料机消耗量分析",true,{"key":20,"text":21,"correct":18},"C","风险分析",{"key":23,"text":24,"correct":14},"D","市场竞争格局分析",{"key":26,"text":27,"correct":18},"E","工程成本分析","BCE","建设工程项目投标报价分析包括工料机消耗量分析、工程成本分析、风险分析和预期利润分析。成熟的施工企业，应编制企业工、料、机消耗定额，投标人编制投标报价时，应当结合招标项目的特点和市场要素价格，参考企业定额确定各项目综合单价，最后汇总形成投标总价。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业实务","建筑工程",0]