[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983913":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983913,714,2,"多选题","采用建设工程量清单报价并实行单价合同时，属于投标人的报价计算过程的是()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","计算工、料、机单价",true,{"key":16,"text":17,"correct":14},"B","依据设计图纸复核招标工程量清单",{"key":19,"text":20,"correct":14},"C","现场考察",{"key":22,"text":23,"correct":24},"D","填写报价清单",false,{"key":26,"text":27,"correct":14},"E","计算各分部分项和单价措施项目的综合单价、合价","ABCE","采用建设工程量清单报价并实行单价合同时，投标人的报价计算过程一般分为以下几个步骤：①研究招标文件；②现场考察；③依据设计图纸复核招标工程量清单；④编制施工方案；⑤计算工、料、机单价；⑥计算各分部分项和单价措施项目的综合单价、合价；⑦确定投标总报价。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业实务","建筑工程",0]