[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983867":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983867,714,2,"多选题","下列关于招标文件的澄清和修改的说法中，正确的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","投标人可要求招标人对招标文件进行澄清或修改",false,{"key":16,"text":17,"correct":18},"B","对招标文件澄清或者修改的内容均为招标文件的组成部分",true,{"key":20,"text":21,"correct":14},"C","对招标文件的修改应以书面形式进行，澄清可以以口头形式进行",{"key":23,"text":24,"correct":14},"D","机电产品国际招标项目对招标文件的澄清应在开标日5日前进行",{"key":26,"text":27,"correct":18},"E","政府采购项目对投标截止时间的修改应在原投标文件截止时间3日前完成","BE","A项，潜在投标人对招标文件存在疑问或发现不合理的规定时，应在招标文件规定的澄清时间前，采用书面形式向招标人提出澄清要求；C项，澄清和修改内容应当以书面形式，在规定时间之前发给所有获取招标文件的潜在投标人；D项，招标文件澄清和修改的内容，有些可能影响投标文件的编制，如计划工期、关键技术指标、工程量清单等修改，其澄清或修改应当在投标截止时间15日前发出，否则应顺延投标截止时间。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业实务","建筑工程",0]