[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983782":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983782,714,2,"多选题","工程建设项目的外部条件有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工程现场作业面条件",true,{"key":16,"text":17,"correct":14},"B","工程地形、地质和水文条件",{"key":19,"text":20,"correct":14},"C","工程施工进场道路和水电通信条件",{"key":22,"text":23,"correct":14},"D","工程周围原有建筑物",{"key":25,"text":26,"correct":27},"E","工程与周围关系的密切程度",false,"ABCD","工程建设项目的主要外部条件有：①工程现场作业面条件；②工程地形、地质和水文条件；③工程施工进场道路和水电通信条件；④工程周围原有建筑物；⑤工程所在地的气象条件、潮汐情况、风俗习惯。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业实务","建筑工程",0]