[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983773":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983773,714,2,"多选题","民用建筑工程设计一般划分为()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","实施性方案设计",true,{"key":16,"text":17,"correct":18},"B","可行性研究",false,{"key":20,"text":21,"correct":14},"C","初步设计",{"key":23,"text":24,"correct":18},"D","招标设计",{"key":26,"text":27,"correct":14},"E","施工图设计","ACE","建筑行业设计一般划分为方案设计、初步设计和施工图设计三个阶段。技术要求简单的民用建筑工程经有关建设主管部门同意，设计委托合同可以约定方案设计审批后直接进入施工图设计，即简化成两阶段设计。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购专业实务","建筑工程",0]