[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983571":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},983571,714,1,"单选题","外国政府贷款项目招标合同签订阶段，部分贷款方规定合同的生效时间为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","合同签订后",false,{"key":16,"text":17,"correct":18},"B","合同签订并报贷款方审批或备案后",true,{"key":20,"text":21,"correct":14},"C","合同经财政部审批后",{"key":23,"text":24,"correct":14},"D","办理退（免）税手续后","外国政府贷款项目招标签订合同阶段，部分贷款方规定合同签订后应报贷款方审批或备案后才能生效，项目单位应按照其规定办理相关手续。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]