[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983558":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},983558,714,1,"单选题","机电产品国际招标项目采用综合评价法评标，投标人综合得分相同的，推荐中标候选人的做法是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","按投标报价由低到高的顺序排列",false,{"key":16,"text":17,"correct":14},"B","按技术指标优劣顺序排列",{"key":19,"text":20,"correct":21},"C","按价格得分高者排名优先",true,{"key":23,"text":24,"correct":14},"D","按技术得分高者排名优先","机电产品国际招标项目采用综合评价法评标时，评标委员会根据综合评分对各投标人进行排名。综合评分相同的，价格得分高者排名优先；价格得分相同的，技术得分高者排名优先，并依照商务、服务及其他评价内容的分项得分优先次序类推。评标委员会应当推荐综合排名第一的投标人为推荐中标人。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]