[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983555":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},983555,714,1,"单选题","对机电产品国际招标项目进行评标时，若采用综合评价法，评标委员会成员对某一投标人的分项评分偏离超过评标委员会全体成员的评分均值()，该成员的该项分值将被剔除。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","±5%",false,{"key":16,"text":17,"correct":14},"B","±10%",{"key":19,"text":20,"correct":21},"C","±20%",true,{"key":23,"text":24,"correct":14},"D","±30%","采用综合评价法评审机电产品国际招标项目时，评标委员会成员对同一投标人的商务、技术、服务及其他评价内容的分项评分结果出现差距时，应遵循以下调整原则：评标委员会成员对某一投标人的分项评分偏离超过评标委员会全体成员的评分均值±20%，该成员的该项分值将被剔除，以其他未超出偏离范围的评标委员会成员的该项评分均值替代；各评标委员会成员对某一投标人的分项评分偏离均超过评标委员会全体成员的该项评分均值±20%，则以评标委员会全体成员的该项评分均值作为该投标人的分项得分。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]