[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983547":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},983547,714,1,"单选题","接收投标文件和开标前后两个环节，检查投标文件的密封情况应当依次分别由()负责。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","招标人、招标人",false,{"key":16,"text":17,"correct":14},"B","投标人、投标人",{"key":19,"text":20,"correct":21},"C","招标人、投标人",true,{"key":23,"text":24,"correct":14},"D","招标人、行政监督人员","",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]