[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983477":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},983477,714,1,"单选题","投标截止时间结束后参加政府采购货物投标的供应商不足3家的，除采购任务取消情形外，招标采购单位应当报告()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","财政部",false,{"key":16,"text":17,"correct":14},"B","省级人民政府",{"key":19,"text":20,"correct":14},"C","政府采购监督管理部门",{"key":22,"text":23,"correct":24},"D","设区的市、自治州以上人民政府财政部门",true,"政府采购货物和服务招标项目投标人不足3个的，招标人可以重新招标或经设区的市、自治州以上人民政府财政部门同意后改为采用竞争性谈判、询价或者单一来源等其他方式采购，但是原招标文件有不合理条款，其招标公告时间及程序不符合规定的，必须重新招标。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]